Pencil sketch of Bend at dusk: snowy Cascade peaks, the Old Mill smokestacks and flag, rooftops, and a lighthouse beacon shining across town
The Bend Beacon
Serving Bend, Oregon (Deschutes County)Vol. 1, No. 2
Government

Bend's Central Library earns top LEED green-building rating

The Deschutes Public Library says the building, which opened in May, runs on its own solar power and now holds LEED Platinum status.

ShareFacebookXEmail
Collage of Bend's Central Library: the building's exterior with solar panels on the roof and a snow-capped mountain behind it, shelves of books, and the multi-story wood atrium with a large suspended sculpture and people browsing. A gray LEED Platinum badge sits in the center.
Bend's new Central Library has won an honor for its energy efficiency. — Deschutes Public Library

BEND, Ore. - Bend's new Central Library has earned LEED Platinum certification, the highest level of a widely used green-building rating, the Deschutes Public Library announced today.

Net-zero energy public libraries remain rare across the United States.

Strobel said the Central Library and the Redmond Library are now the library district's two LEED Platinum buildings. She said they are the only two public buildings in Central Oregon with that status, according to the library's news release.

The release says the building was designed to produce as much energy as it uses, with 47,000 square feet of on-site solar panels generating 1.11 gigawatt hours a year. It uses no fossil fuels, the library says, so everything from lighting and heating to electric-vehicle charging runs on solar power.

The release also points to the wood ceiling and columns inside. It says the dowel-laminated timber is from Canada, and that LEED required all of the wood to come from sustainably managed forests.

The library says it opened May 11, after about two years of construction, at 61956 SE Santorini St., according to its Central Library page. It has a solar array, meeting and study rooms on every floor, a children's area, a MakerSpace and a Thump Coffee cafe in the lobby.

Voters approved the library's bond measure in November 2020. The release says it paid for the Central and Redmond libraries and updates at the La Pine, Sisters and Sunriver libraries. A remodel of the Downtown Bend Library is set to reopen in summer 2027.

The release adds that the Central Library also won a 2026 Building a Better Oregon Award from the Cascades East Association of Realtors.

Source: Deschutes Public Library, Central Library Achieves LEED Platinum Certification, posted Nov. 18, 2026; Central Library; New Central Library to Open to Public May 11.

Drafted by AI from the linked public source. Approved by a Daily News Editor.

Sources and documents